Today I submit of both of report which is project
proposal progress and chapter 1, 2 and 3 of final report. Here I attach the
picture of the report. After completing my two little of this report have been
getting my overview to make this project the following semester
Wednesday, 14 November 2012
Thursday, 8 November 2012
weekly progress report (week 8-15)
CONTINUED WEEKLY PROGRESS REPORT
Week 8
- send a draft proposal to the project advisor for revised and updated
- updating the blog
- send a draft proposal to the project advisor for revised and updated
- updating the blog
Week 9
- asked the lecturer what should be included in the slide presentation
- identify what needs to be explained during my presentation project proposal later and trying to find additional information and examples of information so that I can explain my project will do later. Besides that, I also tried to ask the senior students of this and also try switching exchange ideas in this discussion.
- make a slide presentation for next week
- asked the lecturer what should be included in the slide presentation
- identify what needs to be explained during my presentation project proposal later and trying to find additional information and examples of information so that I can explain my project will do later. Besides that, I also tried to ask the senior students of this and also try switching exchange ideas in this discussion.
- make a slide presentation for next week
Week 10
- little update slides and prepared for presentation on Thursday
- project proposal presentation on Thursday from 3 pm to 5 pm
- little update slides and prepared for presentation on Thursday
- project proposal presentation on Thursday from 3 pm to 5 pm
Week 11
- repair and make additions from the draft proposal submitted during week 8
- updating the blog
- repair and make additions from the draft proposal submitted during week 8
- updating the blog
Week 12
- continue the work of making a report and blog work
- continue the work of making a report and blog work
Week 13
- continue the work of making a report and blog work
- continue the work of making a report and blog work
Week 14
- finish updating the blog works
- trying to complete all project proposal progress report and chapter 1, 2 and 3 of the final report before next week
- This weekend I print all project proposals progress report and chapter 1, 2 and 3 of the final report
- finish updating the blog works
- trying to complete all project proposal progress report and chapter 1, 2 and 3 of the final report before next week
- This weekend I print all project proposals progress report and chapter 1, 2 and 3 of the final report
Week 15
- submit of the project proposal progress report and chapter 1, 2 and 3 of final report.
- submit of logbook or blog
- submit of the project proposal progress report and chapter 1, 2 and 3 of final report.
- submit of logbook or blog
Wednesday, 31 October 2012
FORMAT FIRST THREE CHAPTER OF THE FYP REPORT
The students are
required to attach their first three chapter of the FYP report with this progress
report.
Chapter 1: Introduction
1.1 Introduction of chapter
1.2 Project Background
1.3 Project Statement
1.4 Objective
1.5 Scope of Project / Limitation
1.6 Summary of Chapter
Chapter 2: Literature
Review
2.1 History
2.1.1 Previous Work
2.1.2 Present Work
2.2 Review of History
2.3 Summary
Chapter 3: Methodology
3.1 Introduction
3.2 Block Diagram
3.2.1 Explanation
3.3 Hardware & Development
3.4 Software Development
3.5 Summary
Monday, 29 October 2012
PROGRESS REPORT AKU
To:
Sir Azuki Bin Abdul Salam
From:
Ahmad Fadhil Bin Mohamed (51210111019)
Date:
November 13, 2012
Subject:
Progress Report (from July 30 to November 16, 2012): Development Of Solar Power
Tracker For Water Pumping System
Introduction
The
purpose of this project is to research about solar power tracker for water
pumping system. This project mainly to be used in irrigation such as
agriculture. The project is to easy
transfer water efficiently and reliably from sources such as spring, river,
tanks and dams. For
farmers with a creek running through their properties, using a solar powered
water pumping solution means less fouling of waterways and far less erosion of
banks. This progress report discusses the progress I
have made from July 30 to November 16.
Work
Completed from July
30 to November 16
During this period, I finish do the proposal report,
presentation and three chapters from the final report which discussed the Solar
Power Tracker for Water Pumping System
that will keep the solar panel aligned with the sun and the output of the solar
power is used to generate electricity to pump water operations can be done. During
the process to finish my report the main task that I learn from this project is
how to make the solar panel always follow the sun. The LDR sensor is the
important equipment that must have to track the sun. Not forget the servo motor
also important to move the solar panel aligned with the sun and most important
things is electric water valve can pump water well. I do a lot of research from
internet and also some books regarding this project and then compare with my
own knowledge. I also have begun working on the program and the controller that
I want to use. After do research what type of programming and controller used
for this project and I decided to choose controller PIC16f877a and C Language
for program this project. The type of programming and the combination system
schematic diagram circuit I explain briefly in the methodology section.
Work
to be Completed by May 2, 2013
Next,
I need to finish all the chapter of final report on formation by making
corrections and proofing the chapter. This will be completed by May 2, 2013. I
will continue the chapter until the end of chapter with does the hardware of
this project. Every work I do will write on the report. I will then write the conclusion
and management implications for the final paper. The entire project should be
completed by the first week of May 2013.
Problems
Encountered
During
the research of my project Solar Power Tracker for Water Pumping System, I have
some problems with the situation as the example did the output power after
using my tracker devices is more than using the fixed solar panel. I have to do
some calculation and research to encountered the problem. However the project
is still on schedule and will proceed as how the project was planned.
Conclusion
My
research project is on schedule and I should encounter no problems finishing it
by May 2, 2013. If you have any questions or concerns with this project, please
feel free to email me at fadhilsmile00@gmail.com
FORMAT PROGRESS REPORT
PROGRESS
REPORT: (TITLE OF PROJECT PLUS THE PERIOD COVERED)
I. Introduction/Purpose
Purpose of the report: Very briefly
explain the project.
Briefly explain what this progress report
is for.
Time period covered for the Progress
report.
II. Work completed during this
time period. (Dates)
Explain what you have accomplished.
Provide details.
Project Staffing. How much effort has
been used to date?
Project Deliverables. Have they met the
quality targets set?
III. Work you need to complete
before you finish the project.
What is the next step?
When do you expect to complete the next step?
What do you still need to do?
When do you expect to complete the
project?
IV. Problems encountered
Explain any unexpected developments.
Explain what you plan to do to correct
these problems.
State whether the project is on
schedule.
If not, why not?
How do you plan to correct these
problems?
When will you be back on schedule?
V. Conclusions
Saturday, 27 October 2012
PROJECT PROPOSAL
REFERENCES
[1] Bill Lane, Solar Tracker, Cleveland State University. Cleveland, Ohio
44115. 2008
[2] Isaac Aunkst , Solar Panel Tracking , Penn
State Erie, The Behrend College in 2006
[3] F. Huang, D. Tien and James Or ,Microcontroller Based Automatic Sun
Tracker Combine with a New Solar
Energy Conversion Unit , On page(s): 488 - 492 Vol.1, Sch. of Eng. Sci., Simon Fraser Univ., Burnaby, BC,
Canada. 1998.
[4] Montie ales Vitorino, Mauricio Beltraode
Rossitter Correa.Cursino Brandao Jacobina,"An Effective Induction Motor
Control For Phtovoltaic Pumping "IEEE Trans. Ind. Electron., vol. 58,
April 2011
[5] Anonymous, Uni-solar, Solar energy
produces catalog and brochures, USA, 2001.
[6] Anonymous,
Solar Cells EİE Department of Research on electricity applications, Ankara, Turkey,
1992.
[8] Helikson, H.J
and Others, Pumping water for irrigation using solar energy, University of
Florida, USA, 1995.
[9] Romy Kansal, PIC Based Automatic Solar
Radiation Tracker, THAPAR UNIVERSITY
[10] P JAYARAMA REDDY Science and technology of PHOTOVOLTAICS, India: second edition, 2009
Friday, 26 October 2012
PROJECT PROPOSAL - Conclusion
In
all systems there are losses due to such things as voltage losses as the
electricity is carried across the wires, batteries and inverters not being 100
percent efficient, and other factors. These efficiency losses vary from
component to component, and from system to system and can be as high as 25
percent. Otherwise using tracking system is better to increase the system
output compare to fix position in term of cost and technical performance. The
solar water pumping system able to support the small scale of paddy field from
quarter acre up to seven acre. This system is complete with water level control
for water reservoir and paddy field because the paddy plantation behavior is
sensitive to water level. This project able to helps the farmer to improve the
paddy production for outside the granary of paddy field.
Since
the increase in price per increase in unit power output of a photovoltaic
system is greater than that for a diesel, gasoline, or electric system,
photovoltaic power is more cost competitive when the irrigation system with
which it operates has a low total dynamic head. For this reason, photovoltaic
power is more cost-competitive when used to power a micro irrigation system as
compared to an overhead sprinkler system. Photovoltaic power for irrigation is
cost-competitive with traditional energy sources for small, remote
applications, if the total system design and utilization timing is carefully
considered and organized to use the solar energy as efficiently as possible. In
the future, when the prices of fossil fuels rise and the economic advantages of
mass production reduce the peak watt cost of the photovoltaic cell,
photovoltaic power will become more cost-competitive and more common.
PV
solar water pump system to solve problems of agricultural water conservancy and
desert control with agricultural farmland decrease, the desert area continues
to expand, the extreme arid climate impact on food production, solving water
supply has become the root of problem of agriculture. Compared with the traditional
diesel pump and electric pump irrigation, solar pump has great advantage. It
will become the main way of agricultural irrigation in the future, has a wide
application prospect.
Thursday, 25 October 2012
PROJECT PROPOSAL - Budget
The
total cost of this project is about RM 600. The project is low cost different than the other solar tracking system. Maybe after the
real project the cost is above than the real value so that this estimate for
this project.
Tuesday, 16 October 2012
PROJECT PROPOSAL - gant chart
WORK PLAN
The work plan will be
follow by this Gant Chart. The time frame allocated for this research study is
5 months. It will start in July 2012 and is proposal projected to be completed
in December 2012. The Gantt chart for the project and its milestone are shown
as in Table below.PROJECT PROPOSAL
BENEFITS/ CONTRIBUTIONS
Solar water pumps are used for irrigation of crops, water livestock and
provide portable drinking water. Solar water pump uses peak solar array output
which frequently coincides with high water demand during long, dry summer days.
In the event of cloudy weather solar water pump systems often use storage tanks
to store excess water. Solar water pumps do not require fuel or constant
maintenance. Solar water pumps can also be designed for portability to be moved
as water demand or change of season requires. Their operating cost is less
compared to diesel pumps. Recent fuel price increases and generally intensive
maintenance schedules however can make diesel pumps expensive. Advantage of this Solar penal, it also comes with
two light sensors (LDR) which LDR is working to identify the
position angle of the sun,
allowing the photovoltaic technology is
in the right angle facing the sun. The SPV sets are highly economical when combined
with water conservation techniques such as drip irrigation & night time
distribution of (day time pumped & stored) water. The SPV system leads to
optimum exploitation of scarce ground water. The life cycle and the cost to
ultimate beneficiary
make the SPV systems cost effective as compared to conventional systems. IN
addition the farmer is saved from the capital investment he has to make for
drawing lines from the grid to his field/farms.
PROJECT PROPOSAL
AIM
To
qualify for the award of engineering technology degree in electrical
engineering technology, I chose this project of solar power water pumping
system and created a bit of help and reduce the burden on farmers, particularly
to facilitate their agricultural drainage and reduce gas emissions and oil if
using the engine. The aim of this article is to explain how solar powered water
pumping system works and what the differences with the other energy sources
are. After that, I can improve my skills and knowledge in problem solving
research over the internet or books.
OBJECTIVE
The
objective of this project is to design hardware for power generation. The
purpose of the project is to easy transfer water efficiently and reliably from
sources such as spring, river, tanks and dams. These design also conduct and
construct solar power unit that is portable and functional for domestic
application and suitable for educational apparatus. At the same time this
project could also serve as back-up power supply.
The
objectives project also are to make sure all the theories and practical that
the student has learn in the University Kuala Lumpur has been used to finish
this final project. In this project the student will be used the subject that
have learned. This entire subject was used to make sure that the student
understands what the student has learned in the University Kuala Lumpur.
STATEMENT OF HYPOTHESES
By
adding solar panels to power the water pumps on the ranch, it will prove to be
cost beneficial over a certain amount of time because of incentives and
elimination of monthly electricity costs through the use of a renewable energy
source system.
There
is a potential market for solar energy systems implementation and used for agricultural operations,
especially in the irrigation system and remote areas or where the use of an alternative energy
source is desired. It is possible to define and quantify this market, as
well as to justify it in terms of social, environmental and economic
sustainability.
Monday, 15 October 2012
Sunday, 14 October 2012
PROJECT PROPOSAL - introduction
INTRODUCTION
Each student who takes
an engineering degree at UniKL BMI technology should complete the final year
project report. Final year project is one of scientific research related to the
field of study in the faculty that must be provided by the final year students
as being eligible for the award of engineering technology degree. This
introduction describes the project objectives.
The purpose of this
project is to provide water to farmers and landowners with information
on planning and installing solar-powered water pumping systems. Because
every location has different needs and resources, this project provides the
general principles required to make an informed decision on whether or
not a solar pump is right for your operation.
While there are several
possible methods for supplying water to remote pastures, such as wind,
gas/diesel pumps, and ram pumps, solar-powered water pumps may offer the best
option in terms of long-term cost and reduced labor. In the relatively
rare instances with favorable topography and spring or pond location, ram pumps
or gravity feed may be better options. In flat areas where the water is
supplied by a remote well and where there is limited access to the power grid,
solar pumps appear to be the best option.
Solar pumps offer a
clean and simple alternative to fuel-burning engines and generators
for domestic water, livestock and irrigation. They are most effective
during dry and sunny seasons. They require no fuel deliveries, and very little
maintenance. Solar pumps are powered by photovoltaic (solar electric)
panels and the flow rate is determined by the intensity of the sunlight.
Solar panels have no
moving parts, and most have a warranty of at least 20 years. Most solar pumps
operate without the use of storage batteries. A water tank provides a simple,
economical means of storage. Solar pumps must be optimally selected for
the task at hand, in order to minimize the power required, and thus
the cost of the system. A wide variety of solar pumps is available, to meet a
wide variety of needs.
PROJECT PROPOSAL - abstract
ABSTRACT
The purpose of this
research is to describe about solar power tracker for water pumping system. Solar photovoltaic water pumping
systems can provide drinking water without the need for any kind of fuel or the
extensive maintenance required by diesel pumps. Photovoltaic (PV) panels are
often used for agricultural operations, especially in remote areas or where the
use of an alternative energy source is desired. In particular, they have
been demonstrated time and time again to reliably produce sufficient
electricity directly from solar radiation (sunlight) to power livestock and
irrigation watering systems. This system is mainly
to be used in irrigation such as agriculture. The function of the project is to
easy transfer water efficiently and reliably from sources such as spring,
river, tanks and dams. This system begins with a solar panel that will use
light energy from the sun to generate electricity through the photovoltaic (PV)
effect to produce dc power charger controller will control excessive current
flow flowing into the battery. In addition to over-protection, state-of-charge
control low voltage or battery needed for preventing deep discharge damage to
the battery. Low voltage relay acts as an automatic switch to disconnect pump
before the battery voltage is too low. Relay activated and switched on when the
battery voltage dropped to "low voltage" threshold, and de-activate
and switch back when the battery voltage is increased to "reconnect"
threshold. Most of the PV equipment supplier offering charge regulator controls
that combines both overcharge protection and low voltage disconnect to protect
battery. After that voltage regulator is placed between the battery and the
pump to maintain an appropriate level of voltage pump then to operate pumps the
water from the river to the water tank. On the other hand water tank there is a
sensor that will detect presence to the extent required.
PROJECT PROPOSAL - cover page
PROJECT PROPOSAL
DEVELOPMENT OF SOLAR POWER TRACKER FOR WATER PUMPING
SYSTEM
STUDENT NAME: AHMAD FADHIL
BIN MOHAMED
ID NO: 51210111019
INSTITUTION: UniKL BRITISH
MALAYSIAN INSTITUTE
SECTION: BACHELOR OF
ENGINEERING TECHNOLOGY ELECTRICAL
SUPERVISOR: SIR AZUKI BIN
ABDUL SALAM
DATE: 15 NOVEMBER 2012
Friday, 28 September 2012
Assalamualaikum
Proposal Format
Title Page
Contains short, descriptive title of the proposed project
Includes student’s name, student’s ID number,
Institution, section/ department, project supervisors
Name and date of delivery
Abstract
A brief summary of the project proposal
Present a brief introduction of the issue
Make the key statement of the project
Include possible implication/benefits of the work
Table of Contents
List all headings and subheadings with page numbers
Introduction
Sets the context for the proposed project and must capture the
reader’s interest
Explain the background of the study from a broad picture
narrowing in on the research/ project question
Review what is known about the research topic as far as it is
relevant to the research/project
The introduction should be at a level that makes it easy to
understand for readers with a general science background
Problem Statement
A
short summary of the research problem
Literature Review
A short and precise overview about the present state of research
that is immediately connected with the proposed project
Name and discuss the most important contributions of other
related projects/findings
Methodology
Contains an overall description of the approach, materials, and
procedures
What methods will be used?
How will data be collected and analyzed?
What materials will be used?
Include calculations, techniques, procedures and equipment
Detail limitations, assumptions, and range of validity
Objectives
Give a concise and clear outline of the aims that the researcher
wants to achieve from the project
Benefits/Contributions
Contains explanations on how the new findings/ideas will
contribute to the industry/community
Reasons on why it is worth knowing and what are the major
implications of the research findings
Work Plan
Details on how the project will be conducted
List the stages of the proposed project
Indicate deadlines; set for completing each stage of the project
Discuss any particular challenges that need to be overcome
Budget
Estimation
on overall cost of the project
Conclusion
Explanation on the possible outcomes of the project
Discussion on the new knowledge gained from the project
Identification
of the target user/ areas/ application of the research findings
References
List all references cited in the text
List all references cited in the text
Thursday, 27 September 2012
Incomplete draft proposal
From
this delivered draft many worthwhile things and comment can I take from my
project advisor. The problem is, in terms of spelling words for negligence.
Such attitudes must be avoided so that the same mistakes can be averted. Apart
from that negligence in the use of Microsoft word do not justify the paragraph.
For the report, many things that should be added between the literature review,
Gant chart, costing o budget, software and development and reference. As a
whole all the things I have to fix and update the actual report I enter later.
Friday, 7 September 2012
weekly progress report (week 1-7)
WEEKLY PROGRESS REPORT
Week 1
- thinking about the final year project
- looking for project ideas to be made and the project title
- looking for a lecturer to be the final year project advisor
- thinking about the final year project
- looking for project ideas to be made and the project title
- looking for a lecturer to be the final year project advisor
Week 2
- find a title for my project
- research about this project
- confirm my project advisor
- make project progress report to the advisor and then submit to him
- find a title for my project
- research about this project
- confirm my project advisor
- make project progress report to the advisor and then submit to him
Week 3
- interested in other projects while doing research on previous projects
- change the title of the project
- confirms the new project by filling form taken FYP web sites Bmi. The form must also be confirmed by my project advisor first before it is sent to the FYP coordinator.
- interested in other projects while doing research on previous projects
- change the title of the project
- confirms the new project by filling form taken FYP web sites Bmi. The form must also be confirmed by my project advisor first before it is sent to the FYP coordinator.
Week 4
- research about the new project and start to do the proposal
- research about the new project and start to do the proposal
Week 5
- research component and equipment about this project
- find a project advisor to ask questions about things that I find
- research component and equipment about this project
- find a project advisor to ask questions about things that I find
Week 6
- make and design blog / logbook to meet conditions set by the students who take the subject of this final year project
- my purpose to make and using the blog is to show the work process or operation sequence that I do to prepare my final year project which will do later. In addition, it is also for me to update new information that I could be the result of my research project
- make and design blog / logbook to meet conditions set by the students who take the subject of this final year project
- my purpose to make and using the blog is to show the work process or operation sequence that I do to prepare my final year project which will do later. In addition, it is also for me to update new information that I could be the result of my research project
Week 7
- see my project advisor to ask how to make a literature review and how to simplify my example in referring to the proposal and to complete the task that I need to do.
- see my project advisor to ask how to make a literature review and how to simplify my example in referring to the proposal and to complete the task that I need to do.
Thursday, 6 September 2012
Draft project first and second weeks before change to the project now
INTELLIGENT TRASH FOR DISABLE
PEOPLE ESPECIALLY
ABSTRAK
“Intelligent
trash” merupakan salah satu tong sampah automatik dimana ia merupakan ciptaan
baru yang sesuai di gunakan oleh setiap
lapisan masyarakat khususnya orang yang kurang upaya. Kebiasaannya tong sampah
yang kini berada di pasaran kebanyakkannya merupakan tong sampah yang
beroperasi secara manual samaada
menggunakan tangan ataupun kaki untuk membuka penutup tong sampah, dan ini akan
menyukarkan orang kurang upaya untuk membuang sampah. Dengan adanya, tong
sampah automatik ini, ia sedikit sebanyak dapat membantu orang kurang upaya.
Tong sampah automatik ini akan mula beroperasi sekiranya sensor yang terdapat
di bahagian depan tong sampah tersebut, mengesan atau mengenal pasti sesuatu
objek apabila menghampirinya dalam jarak 3 kaki dan secara automatiknya penutup
tong sampah akan terbuka dan dalam beberapa saat selepas itu penutup tong
sampah tersebut akan tertutup. Sekiranya sampah didalamnya sudah penuh, tong
sampah ini akan memberikan isyarat bunyi dan secara automatiknya sistem tong
sampah ini dimatikan (cutoff), dan pada masa ini walaupun terdapat objek yang
menghampiri tong sampah ini, ia tetap tidak akan berfungsi sehingga butang
reset ditekan. Selain itu, keistimewaan tong sampah automatic ini adalah, ia
mudah alih (portable) dimana ia boleh diletakkan dimana-mana bahagian sekali
pun kerana ia tidak menggunakan bekalan kuasa tetapi menggunakan sel kering
12V. Walaubagaimanapun, tong sampah automatik ini masih banyak yang perlu
diperbaiki dan penambahbaikkan dari segi aspek operasinya dan sistem
dalamannya.
ABSTRACT
Intelligent
trash is an automatic waste bin which is new innovation that can be used by
all, specifically disable people. Most waste bins that exist in the market
nowadays are manually operated. The user either needs to use hand or foot to
open its lid. Hence, it is difficult for disable people. This new waste bin
will open its lid when an object is detected at least three feet from a sensor
which place in front of it. I will automatically shut of after a few seconds.
When the waste bin is full, a buzzer will be activated. If a user to come near
the waste bin, it will not open until the reset button is pressed. Advantage
this waste bin is that, it is portable and can be used anywhere in the home,
office or outside. It uses only a dry battery of 12V.
INTRODUCTION
Each
student who takes an engineering degree at UniKL BMI technology should complete
the final year project report. Final year project is one of scientific research
related to the field of study in the faculty that must be provided by the final
year students as being eligible for the award of engineering technology degree.
This introduction describes the project objectives.
AIM
To
qualify for the award of engineering technology degree in electrical
engineering technology, I chose the title of the project and create automatic
trash can to some extent be able to help and ease the burden for people with
disabilities to a garbage dump. Besides that I can enhance my knowledge and
skills in problem solving research over the internet or books.
OBJECTIVE
The
objective of this project is to design a system using the trash PIC (PIC
microcontroller) as a controller and sensor. This rubbish bin is designed to
facilitate an individual to throw garbage in particular persons with
disabilities.
This
trash will operate if there is a movement where the trash is approached using transmitters
sensor receiver will send all the data it receives to the PIC controller to
enable the next process goes smoothly the next process which involves the
movement of the motor to allow the dustbin lid open without using hand or foot.
Other
objectives in the success of this project is to introduce a system that is more
'hygienic' as a system based hygiene can be widely used either in the office,
hospital and home. With the use of this automatic dustbin, could indirectly
prevent the spread of bacteria that can cause various diseases.
The
project also allowed me to learn the use of PIC and its advantages compared to
the control system used at present.
Subscribe to: